Miravo

Commercial Building

Three-floor office tower. HVAC, central plant, emergency power.

A three-floor office tower. One rooftop HVAC unit per floor, central chilled-water plant, hot-water heating loop, supply fan motors, one standby emergency diesel generator.

Mixed asset ages across floors and plant equipment: floor-3 HVAC at 12,000 hours, floor-2 at 8,000, boiler at 7,000, chilled-water pump at 4,000, AHU fan motors at 5,000. Older units run warmer, pull more power, and work the heating loop harder.

What's running

AreaAssets
HVACRooftop units
Chilled waterCentral chiller, circulation pump
HeatingBoiler, heating-loop pump
ElectricalAHU fan motors, standby emergency diesel generator

Use cases

  • Building management system demo in plain terms.
  • Occupancy-driven HVAC behaviour across floors.
  • Newer and older building equipment in one run.
  • Backup power within a building context.

Launch

Console ⭢ CatalogCommercial BuildingLaunch. No restart required.

Verified

In Catalog, Commercial Building shows the active instances and models. Fleet view keeps updating after launch.

Next

Was this page useful?

Last updated on